Discuss Scratch

elevator905_rises
Scratcher
2 posts

Skyscrapersim: LF Integration Project

Lighthouse_Friesland wrote:

I'm feeling a bit down (Again!)
Unfortunately, I'm sorry to say again, but I'm going to delay my work on Skyscraperville High Street for probably one week. This is because I'm not feeling all that great right now. Afterwards, I will resume work on this IP.
Oh no! When you will come back?
Lighthouse_Friesland
Scratcher
56 posts

Skyscrapersim: LF Integration Project

elevator905_rises wrote:

Lighthouse_Friesland wrote:

I'm feeling a bit down (Again!)
Unfortunately, I'm sorry to say again, but I'm going to delay my work on Skyscraperville High Street for probably one week. This is because I'm not feeling all that great right now. Afterwards, I will resume work on this IP.
Oh no! When you will come back?
Sorry for the late response, I'm back now. I had a cold that time.

Here's my plan for Skyscrapersim:

Today:
circa 15 o'clock: Skyscraperville High Street (Building the platform stairs)
circa 17 o'clock: Lighthouse Cruise Center (Starting the construction; building the main structure)
circa 19 o'clock: Skyscraperville High Street (Building the station elevator)
Tomorrow:
circa 13 o'clock: The Piles Centre


Jobs to do before the next release:
- Skyscraperville High Street: Building the platform stairs and the station elevator
- Lighthouse Cruise Center: Starting the construction and building the main structure
- The Piles Centre

I hope soon it will be ready for release sometime this month or in May.

Last edited by Lighthouse_Friesland (April 14, 2025 14:02:35)

Lighthouse_Friesland
Scratcher
56 posts

Skyscrapersim: LF Integration Project

Update: 30/04/2025
A new staircase has been built serving the platform level (-2) with the concourse level (-1) in the High Street.
https://aufzugskanal.infinityfreeapp.com/skyscrapersim/skyscraper-20250430_191243158.jpg
https://aufzugskanal.infinityfreeapp.com/skyscrapersim/skyscraper-20250430_191247456.jpg
Soon, I hope to have a good start on Lighthouse Cruise Center. Lighthouse Cruise Center will be a 2-floor ferry terminal located in Skyscraperville too, with an 8-floor telecommunications tower nearby.

Last edited by Lighthouse_Friesland (April 30, 2025 17:41:59)

Lighthouse_Friesland
Scratcher
56 posts

Skyscrapersim: LF Integration Project

To elevator1512: Yes, there will be a classic elevator in the telecommunications tower.

Last edited by Lighthouse_Friesland (May 1, 2025 07:57:29)

Lighthouse_Friesland
Scratcher
56 posts

Skyscrapersim: LF Integration Project

Update: 02/05/2025
Construction has been started on Lighthouse Cruise Center, but yet without the telecommunications tower. What I wanted to say is that a Stahl goods lift was added into the ferry terminal. It serves K (-1) (Storage and Boiler Room), 0 (Arrivals), 1 (Departures) and 2 (Observatory and Offices). Note there is a rear door and it opens on the 1st floor.
https://ibb.co/prRgkVnf
See this weird elevator door? Next, I hope to install a second track into the High Street.
I wanted to tell y'all too that the ferry terminal has planned to have 6 Stahl elevators (4 goods lifts and 2 passenger lifts; 1 already built, y'know that), additionally a classic Otis elevator in the telecommunications tower.

Last edited by Lighthouse_Friesland (May 2, 2025 16:12:28)

Lighthouse_Friesland
Scratcher
56 posts

Skyscrapersim: LF Integration Project

Update: 03/05/2025
In an unexpected turn of events, focus has been stayed on Lighthouse Cruise Center. 3 more goods lifts have been installed there, that means, all goods lifts have been installed. The left lift in the left of the picture is the goods lift that was already built yesterday.
https://ibb.co/Fk55xHyq
All goods lifts look exactly the same, but they serve different floors: I already said which floors the left lift on the back serve. The right lift on the back serves K, 0 and 1, the right lift on the front serves K, 0 and 2 and the left lift on the front only serves K and 0.
https://ibb.co/BKQz4jK0
Soon, I hope to build a second track into the High Street.

Last edited by Lighthouse_Friesland (May 3, 2025 18:14:24)

Lighthouse_Friesland
Scratcher
56 posts

Skyscrapersim: LF Integration Project

Update: 04/05/2025
A second track has finally been installed into the High Street Subway Station.
https://ibb.co/7JZkb14s
Next, I hope finish installing the elevator there.

To-Do List before releasing Build 6:
1) Finish installing the elevator in the High Street Subway Station
2) Finishing the Cruise Center structure while installing passenger elevators and building the telecommunications tower there
3) Expanding the Thalia building and improving the Fielmann store in the High Street
4) Finishing The Piles Centre Phase III

I'm still reluctant to announce the next build release date but it might come sometime this summer.

Last edited by Lighthouse_Friesland (May 4, 2025 12:58:30)

Lighthouse_Friesland
Scratcher
56 posts

Skyscrapersim: LF Integration Project

Bonus special
I had been meaning to show these pictures yesterday when the four Stahl goods lifts were built (Actually, the pictures were made today):
https://ibb.co/wr47DN39
https://ibb.co/Pvr12pMp
Lighthouse_Friesland
Scratcher
56 posts

Skyscrapersim: LF Integration Project

Update: 05/05/2025
The elevator at the subway station in High Street is now 95% complete, all what I still need to do is an empty room above the ground floor so that lift inspectors can inspect the lift until the lift is on the ground floor (and of course the cartop chassis).
https://ibb.co/mFdV8Lx9
https://ibb.co/ccQYSZj7
https://ibb.co/bgpDz57z
https://ibb.co/RTsvLrfB

Last edited by Lighthouse_Friesland (May 6, 2025 15:54:52)

Lighthouse_Friesland
Scratcher
56 posts

Skyscrapersim: LF Integration Project

Important announcement
I will be inactive during 18 o'clock (CEST) because I will be busy with exercises for the politics learning control. This sadly means that my IP will be on hold for a few days. Sorry for the inconvenience, but the next update will be probably on Thursday. My next job for the IP is make the Otis GeN2 lift in the High Street 100% complete.

Last edited by Lighthouse_Friesland (May 6, 2025 16:04:00)

Lighthouse_Friesland
Scratcher
56 posts

Skyscrapersim: LF Integration Project

Update: 12/05/2025
Hello, I didn't mean to leave a gap for a few more days! Unfortunately, those unforeseen circumstances yesterday impeded my progress once again, this sadly means the Otis GeN2 elevator in High Street is still not 100% complete, that means it is now 98% complete. All I still need to do - is the chassis!
https://ibb.co/gZ6Mwrwr
After the chassis work, I hope to continue work on Lighthouse Cruise Center.

Last edited by Lighthouse_Friesland (May 12, 2025 14:06:46)

Lighthouse_Friesland
Scratcher
56 posts

Skyscrapersim: LF Integration Project

Update: 12/05/2025 - evening
The chassis on the cartop of the Otis GeN2 elevator in High Street has been finally built! This means, this elevator is now 100% complete! I will record and post a video of this elevator soon if anyone is interested in.
https://ibb.co/rRdD2R13
I also wanted to tell you that the chassis feature has been added to RealisticTopBox2024. Next, as said before, I will continue work on Lighthouse Cruise Center. The release will come on or before June 20, 2025.
Lighthouse_Friesland
Scratcher
56 posts

Skyscrapersim: LF Integration Project

So, now I've posted a YouTube video about the Otis GeN2 elevator in the High Street. Here's the link to watch video: https://www.youtube.com/watch?v=dgv11UcEw-A
Lighthouse_Friesland
Scratcher
56 posts

Skyscrapersim: LF Integration Project

Go to https://wiki.skyscrapersim.net/index.php?title=Talk:LF_Integration_Project for the recent updates and Build 6 release
LTV2008
Scratcher
100+ posts

Skyscrapersim: LF Integration Project

By any chance can you upload all of this stuff on the Internet Archive? MediaFire is not really known for good security.
Lighthouse_Friesland
Scratcher
56 posts

Skyscrapersim: LF Integration Project

LTV2008 wrote:

By any chance can you upload all of this stuff on the Internet Archive? MediaFire is not really known for good security.
I will move the download links to Google Drive.

Last edited by Lighthouse_Friesland (Aug. 9, 2025 18:25:08)

Powered by DjangoBB